------------------------------------------------------------
                           α=7.0 —— rat99 —— 99 nodes       
------------------------------------------------------------

——————— Tue, 09 Jan 2024 09:37:22 ————————— seperate y_ij <= y_jj - x_ij on lazy constraints ————————— use blossom = false
BD  —— 49 hubs —— 1-2-3-12-13-22-21-30-29-38-39-48-47-57-56-65-66-75-76-84-83-93-94-95-97-89-88-79-80-71-70-61-62-53-52-51-42-43-34-35-26-25-17-16-7-6-5-4-100-1
total time           3603.31 (TL 3600)    gap                  0.078                
blossom time         0                    nb blossom           0.0                  
LB <= UB             6569.88<=7128.47     Master/SP costs      6563/565.47          
Master time          3311.04              SP time              292.27               
subtour              1819.0               connectivity cuts    2000.0               
uc strategy          4                    uc tolerance         0.01                 
opt. cuts            1970.0               SP method            poly                 
tildeV               2:99                 inst transformation  2                    
2-opt strategy       0                                                              
explored nodes       123196               
F                    183.0                
                                          o_i                  0                                                              
                                          
Found solution RING NODES 1—2—3—12—13—22—21—30—29—38—39—48—47—57—56—65—66—75—76—84—83—93—94—95—97—89—88—79—80—71—70—61—62—53—52—51—42—43—34—35—26—25—17—16—7—6—5—4—100 RING 1 --- 2 | cost [98.0] 1 --- 100 | cost [0.0] 2 --- 3 | cost [63.0] 3 --- 12 | cost [49.0] 4 --- 5 | cost [105.0] 4 --- 100 | cost [196.0] 5 --- 6 | cost [63.0] 6 --- 7 | cost [77.0] 7 --- 16 | cost [182.0] 12 --- 13 | cost [91.0] 13 --- 22 | cost [98.0] 16 --- 17 | cost [91.0] 17 --- 25 | cost [126.0] 21 --- 22 | cost [42.0] 21 --- 30 | cost [126.0] 25 --- 26 | cost [70.0] 26 --- 35 | cost [84.0] 29 --- 30 | cost [77.0] 29 --- 38 | cost [119.0] 34 --- 35 | cost [119.0] 34 --- 43 | cost [42.0] 38 --- 39 | cost [63.0] 39 --- 48 | cost [28.0] 42 --- 43 | cost [56.0] 42 --- 51 | cost [147.0] 47 --- 48 | cost [105.0] 47 --- 57 | cost [147.0] 51 --- 52 | cost [63.0] 52 --- 53 | cost [56.0] 53 --- 62 | cost [147.0] 56 --- 57 | cost [56.0] 56 --- 65 | cost [91.0] 61 --- 62 | cost [63.0] 61 --- 70 | cost [112.0] 65 --- 66 | cost [77.0] 66 --- 75 | cost [112.0] 70 --- 71 | cost [49.0] 71 --- 80 | cost [70.0] 75 --- 76 | cost [91.0] 76 --- 84 | cost [98.0] 79 --- 80 | cost [105.0] 79 --- 88 | cost [98.0] 83 --- 84 | cost [112.0] 83 --- 93 | cost [112.0] 88 --- 89 | cost [105.0] 89 --- 97 | cost [119.0] 93 --- 94 | cost [91.0] 94 --- 95 | cost [126.0] 95 --- 97 | cost [133.0] STAR 8 --> 7 | cost [30.0] 9 --> 7 | cost [60.0] 10 --> 2 | cost [33.0] 11 --> 12 | cost [18.0] 14 --> 5 | cost [36.0] 15 --> 16 | cost [30.0] 18 --> 17 | cost [30.0] 19 --> 21 | cost [75.0] 20 --> 21 | cost [54.0] 23 --> 22 | cost [42.0] 24 --> 25 | cost [27.0] 27 --> 35 | cost [39.0] 28 --> 29 | cost [39.0] 31 --> 30 | cost [36.0] 32 --> 42 | cost [54.0] 33 --> 34 | cost [36.0] 36 --> 35 | cost [33.0] 37 --> 29 | cost [27.0] 40 --> 39 | cost [18.0] 41 --> 42 | cost [42.0] 44 --> 34 | cost [39.0] 45 --> 53 | cost [51.0] 46 --> 47 | cost [24.0] 49 --> 57 | cost [54.0] 50 --> 51 | cost [36.0] 54 --> 53 | cost [42.0] 55 --> 47 | cost [51.0] 58 --> 57 | cost [39.0] 59 --> 61 | cost [63.0] 60 --> 51 | cost [42.0] 63 --> 62 | cost [48.0] 64 --> 65 | cost [42.0] 67 --> 66 | cost [39.0] 68 --> 66 | cost [54.0] 69 --> 70 | cost [27.0] 72 --> 71 | cost [39.0] 73 --> 83 | cost [63.0] 74 --> 75 | cost [42.0] 77 --> 76 | cost [36.0] 78 --> 79 | cost [42.0] 81 --> 80 | cost [39.0] 82 --> 83 | cost [36.0] 85 --> 84 | cost [30.0] 86 --> 95 | cost [24.0] 87 --> 88 | cost [24.0] 90 --> 89 | cost [24.0] 91 --> 93 | cost [42.0] 92 --> 93 | cost [36.0] 96 --> 97 | cost [33.0] 98 --> 89 | cost [51.0] 99 --> 89 | cost [42.0] BACKUP RING 1 --- 3 | cost [1.61] 2 --- 12 | cost [0.91] 3 --- 13 | cost [1.33] 4 --- 6 | cost [1.68] 5 --- 7 | cost [1.33] 5 --- 100 | cost [3.0100000000000002] 6 --- 16 | cost [1.61] 7 --- 17 | cost [2.17] 12 --- 22 | cost [1.82] 13 --- 21 | cost [1.26] 16 --- 25 | cost [0.98] 17 --- 26 | cost [1.33] 21 --- 29 | cost [1.96] 22 --- 30 | cost [1.68] 25 --- 35 | cost [1.54] 26 --- 34 | cost [1.61] 29 --- 39 | cost [1.61] 30 --- 38 | cost [1.75] 34 --- 42 | cost [0.91] 35 --- 43 | cost [1.61] 38 --- 48 | cost [0.77] 39 --- 47 | cost [1.26] 42 --- 52 | cost [1.61] 43 --- 51 | cost [1.82] 47 --- 56 | cost [1.61] 48 --- 57 | cost [1.8900000000000001] 51 --- 53 | cost [1.12] 52 --- 62 | cost [1.75] 53 --- 61 | cost [1.75] 56 --- 66 | cost [1.47] 57 --- 65 | cost [1.33] 61 --- 71 | cost [1.33] 62 --- 70 | cost [1.26] 65 --- 75 | cost [1.68] 66 --- 76 | cost [1.82] 70 --- 80 | cost [0.84] 71 --- 79 | cost [1.68] 75 --- 84 | cost [1.4000000000000001] 76 --- 83 | cost [1.96] 79 --- 89 | cost [1.54] 80 --- 88 | cost [2.0300000000000002] 83 --- 94 | cost [1.96] 84 --- 93 | cost [1.54] 88 --- 97 | cost [1.26] 89 --- 95 | cost [2.24] 93 --- 95 | cost [1.82] 94 --- 97 | cost [2.38] BACKUP STAR 8 --> 6 | cost [0.6] 9 --> 17 | cost [0.75] 10 --> 1 | cost [0.51] 11 --> 2 | cost [0.33] 14 --> 4 | cost [0.45] 15 --> 25 | cost [0.51] 18 --> 16 | cost [0.66] 19 --> 30 | cost [0.75] 20 --> 12 | cost [0.66] 23 --> 25 | cost [0.51] 24 --> 26 | cost [0.51] 27 --> 26 | cost [0.48] 28 --> 30 | cost [0.54] 31 --> 21 | cost [0.5700000000000001] 32 --> 30 | cost [0.66] 33 --> 42 | cost [0.36] 36 --> 34 | cost [0.66] 37 --> 38 | cost [0.51] 40 --> 48 | cost [0.27] 41 --> 39 | cost [0.6] 44 --> 43 | cost [0.42] 45 --> 52 | cost [0.6] 46 --> 38 | cost [0.54] 49 --> 48 | cost [0.63] 50 --> 42 | cost [0.63] 54 --> 52 | cost [0.63] 55 --> 56 | cost [0.54] 58 --> 56 | cost [0.5700000000000001] 59 --> 57 | cost [0.63] 60 --> 61 | cost [0.48] 63 --> 53 | cost [0.63] 64 --> 56 | cost [0.5700000000000001] 67 --> 75 | cost [0.5700000000000001] 68 --> 75 | cost [0.6] 69 --> 71 | cost [0.48] 72 --> 80 | cost [0.54] 73 --> 75 | cost [0.66] 74 --> 65 | cost [0.45] 77 --> 79 | cost [0.5700000000000001] 78 --> 70 | cost [0.5700000000000001] 81 --> 71 | cost [0.51] 82 --> 93 | cost [0.75] 85 --> 76 | cost [0.3] 86 --> 88 | cost [0.54] 87 --> 95 | cost [0.39] 90 --> 97 | cost [0.66] 91 --> 83 | cost [0.48] 92 --> 83 | cost [0.63] 96 --> 95 | cost [0.45] 98 --> 97 | cost [0.39] 99 --> 97 | cost [0.5700000000000001] B = 3.09 i★ = 22 j★ = 21 k★ = 30